Odd Jobs


Photos 1 - 38 out of 38 | Back to Albums
Someone had attempted to repair the tile once.... The mortar was too dry and the foundation crack had not been addressed... We removed the loose tiles and cleaned the area...
Laid out a crack isolation membrane designed for this type of problem...
Now we're ready to tile. New tile, ready for grout. Grouted and drying. Problem solved.
Finished product. This floor has been damaged by leaking water.
The original beam was water damaged and had been devoured by wood boring bees...
So we took it out.... With these handy step jacks....
Oliver hand crafted the new beam...lol
And there you have it. Brand new cedar beam. Now how are we gonna build this box inside this box??? Ship in a bottle anyone?
Before... After...
The new beam installed and painted.  
Photos 1 - 38 out of 38 | Back to Albums
Description: These photos are from various small repair jobs we have done.